The Pavement Management Program is comprised of several roadway maintenance applications including: Pavement and Rehabilitation Program This program includes both milling and overlay contracts and...
Evaluating Existing Conditions Conditions are constantly changing at the mouth of the Jones Falls, where the trash wheel intercepts items that would otherwise make their...
Safe and Scenic Pedestrian Access This Transportation Alternatives Program project provided new sidewalks, parking lot enhancements, additional lighting and new landscaping. Existing sidewalks and curb...
Maintaining What Matters Significant challenges included locating existing utilities, working in close proximity to historic structures and legacy trees, and maintaining vehicle and pedestrian traffic...
Safe and Easy Travel for All The 10-foot-wide hot mix trail provides an off-alignment route from Georgetown to Lewes, and gives pedestrians and bicyclists even...
Preserving Historic Status Eagle Mill Bridge over Little Falls was a register-eligible historic structure. Before anything else, Century prepared the documentation required to document the...
A Change in Direction The original planning concept presented to Century had recommended two lanes of widening along the north side of Cedar Lane. After...
Miles of Redevelopment Park improvements included 14 miles of safe, scenic trails for use by pedestrians, bicyclists, equestrians, and occasional motorists. Design incorporated buffer areas,...
Progress Made The project is divided into two primary sections. The first of which, Section A, involved the conversion of local township road Crows Run...
Streamlined for Success A vital element in positioning a project to be delivered on schedule and within scope and budget lies in the ability of...
Exploring All Options While developers demanded a centralized regional system to better serve Snowshoe and the surrounding resort community, the proposed project’s high cost and...
Existing fields and site features made it challenging to fit the new structures into the site, but the architect and civil engineers were able to...
Satisfying Several Stakeholders Century successfully managed the coordination of a larger-than-usual group of key stakeholders over the course of the project, working with the Anne...
Specific projects include: 50-Year Water and Sewer Master Plan Following an Initial Engineering Assessment Report, Century was tasked with developing a 50-year Water and Sewer...
Making Critical Design Decisions Spanning a two-mile-wide river with a 230-kV transmission line is an inherently complicated feat that requires thorough consideration of all options....
Framing for the Future With limited space allotted for lateral force resisting systems, Century’s structural engineers tailored steel braced frames to provide lateral stability for...
Shared Underground Space The project was unique because all electric and communication ducts were installed in the same duct bank under the sidewalk. This required...