Bonner Bridge Replacement

Bonner Bridge Replacement

The Bonner Bridge, which carries NC12 over the Oregon Inlet between Hatteras Island and mainland North Carolina, was well past its original design life. NXL, a division of Century Engineering, Inc., provided construction inspection services to contribute to the imperative replacement and removal of the previous bridge.

Withstanding Time

Phase I of the project included the construction of the new bridge adjacent to the previous bridge. After the new bridge construction, the old bridge was fully removed. Throughout Phase I, our senior construction inspector monitored the superstructure on the north end and provided additional support as needed with the pile and superstructure inspections. The new bridge was constructed using high-durability concrete and reinforced stainless steel to give it an estimated 100-year life span while providing more options for navigation beneath the bridge.

Implementing Permanent Solutions

During Phase II of the project, we provided construction inspection services during the implementation of permanent solutions for breaches caused by Hurricane Irene in 2011. Withstanding nature’s elements was a top priority for this hurricane-zoned structure, and this new bridge was built to last. 

Project Facts
Owner

North Carolina Department of Transportation (NCDOT)

Location

Dare County, NC

Markets
Project Facts
Owner

North Carolina Department of Transportation (NCDOT)

Location

Dare County, NC

Markets

Have a Project in Mind?

We can help!
contact us