image
  


< Previous Page
 
 
 
US 301 Transportation
Corridor Study
Owner: Maryland State Highway Administration
Location: Prince George's, Charles, Anne Arundel & Calvert Counties, MD
Expertise Provided: Transportation and Environmental Planning, Preliminary Engineering

The US 301 South Corridor Transportation Study investigated multi-modal options including light rail, commuter rail, HOV, TDM, TSM and 5 new freeways to address regional mobility problems. The study corridor was 50 miles long and considered land use and transportation issues in five counties.

Challenges Encountered:
  • LaPlata Study - Identified access control, intersection upgrades and impacts on emergency response times.
  • Waldorf Bypass Study - Identified alignments and developed feasible interchange alternatives for right-of-way preservation.
  • US 301 / MD 4 - Work included geometric design, environmental impact minimization, cost estimates and project presentation to state, county, and local groups.
 
 
 
PROJECT PHOTOS
=  
 
             

Home | About Us | Services | Portfolio | News | Contact Us | Employment | Site Map

© 2009 Century Engineering Inc. All Rights Reserved.
Phone: 1-800-229-8583 Email: cei@centuryeng.com
Best Viewed in Internet Explorer 7/8