image
  


< Previous Page
 
 
 
Howard County Reclaimed Water Pipeline and Pump Station
Owner: Howard County
Department of Public Works
Location: Savage, MD
Expertise Provided: Geotechnical, Laboratory Services

This project involved geotechnical analysis and laboratory material testing for the construction of a pumping station at the Little Patuxent Water Reclamation Plant and about 11,800 linear feet of 16-inch HDPE force main.  Investigation included 65 roadway and/or soil borings.  Extensive laboratory testing was also conducted to determine the classification and suitability for use as backfill for the soils along the force main alignment.  A report was prepared with our findings and recommendations for the force main installation, pipe bedding, thrust restraint, tunneling at major roadway and railroad crossings, and earthwork.

Lab Testing:

  • Classification
  • Compaction
Challenges Encountered:
  • Tunnel Crossings.
  • Excavation support along heavily trafficked roadways.
 
 
 
PROJECT PHOTOS
=  
 
             

Home | About Us | Services | Portfolio | News | Contact Us | Employment | Site Map

© 2009 Century Engineering Inc. All Rights Reserved.
Phone: 1-800-229-8583 Email: cei@centuryeng.com
Best Viewed in Internet Explorer 7/8