| Owner: |
The Buccini/Pollin Group |
| Location: |
Anne Arundel County, MD |
Expertise
Provided: |
Civil, Survey |
Century Engineering prepared civil engineering planning, permitting and construction documents for the construction of a new 11-story, 280 room hotel, and restaurant and conference center. Specific design components included master planning for: a new public roadway (Elm Road extended), future multi-story office space development on the adjoining undeveloped properties and retrofitting access and parking to the existing/adjoining properties that are to be served by the new public roadway.
The development concept required an extensive stream relocation, wetlands mitigation and forest conservation. An extensive stormwater management study including a detailed outfall investigation and drainage study ultimately resulted in issuance of a stormwater quality management and the associated closed storm drain system design to be the only stormwater related design component.
- Relocation of onsite stream and MDE permitting.
- Maintenance of traffic for adjoining owners during retrofit of public roadway.
- Public roadway retrofit and master planning overtop existing, narrow private roadway with inadequate site distance.
- Extensive Downstream Stormwater Conveyance Analysis.
- Concurrent Anne Arundel County and Maryland Aviation Administration stormwater management and erosion and sediment control permitting.
- Master planning for BWI Airport roadway and bicycle route interconnectivity.
|