image
  


< Previous Page
 
 
 
SR 4017 Bridge Replacement
Owner: Pennsylvania Department of Transportation,
PennDOT District 8-0
Location: York County, PA
Expertise Provided: Preliminary Engineering, Final Design and Construction Consultation

Replacement of a 153-foot long, single lane, two-span steel truss with a timber deck bridge with a 166-foot long, two-span prestressed concrete spread box beam bridge. The bridge spans Bermudian Creek. Traffic was detoured during construction.

Challenges Encountered:
  • Roadway alignment improvements.
  • Public involvement.
  • Coordination with the Pennsylvania Historic and Museum Commission.
  • Drainage improvements.
 
 
 
PROJECT PHOTOS
=  
 
             

Home | About Us | Services | Portfolio | News | Contact Us | Employment | Site Map

2009 Century Engineering Inc. All Rights Reserved.
Phone: 1-800-229-8583 Email: cei@centuryeng.com
Best Viewed in Internet Explorer 7/8