image
  


< Previous Page
 
 
 
Findlay Connector, Section 54B
of the Southern Beltway
Owner: Pennsylvania Turnpike Commission
Location: Allegheny and Washington Counties, PA
Expertise Provided: Final Design and Construction Consultation

The two mile section of rural limited access freeway extends from the north side of the proposed Bald Knob Road interchange to north of the proposed interchange with the U.S. Route 30 in Allegheny County. A new interchange was designed at Route 30 which provided for economic development of the corridor.

Challenges Encountered:
  • Three locations with new dual mainline bridges.
  • Design of a diamond interchange at Route 30.
  • Widening of Route 30 from 2 lanes to 5 lanes.
  • Relocation of Point Park Road.
  • Stream relocation.
  • Sensitive environmental considerations.
  • Geotechnical treatments.
  • The project area included acid mine drainage (AMD) from previous mining operations. A mitigation plan was developed for AMD treatment during construction. This plan was the catalyst for construction of a long term treatment system for AMD affecting the Montour Run Watershed.
 
 
 
PROJECT PHOTOS
=  
 
             

Home | About Us | Services | Portfolio | News | Contact Us | Employment | Site Map

© 2009 Century Engineering Inc. All Rights Reserved.
Phone: 1-800-229-8583 Email: cei@centuryeng.com
Best Viewed in Internet Explorer 7/8